Final/Group Project Design
active 2023-09-25 → 2023-11-26 (UTC)
Archive files: complete28,650 / 28,650 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-20 (UTC)Some event types are under-captured. Data limits →
Events
202
Pushes
78
Pull requests
46
Issues
0
Recorded stars
0
Recorded forks
0
Activity over time
Daily event counts in the loaded window
Line chart, 63 days from 2023-09-25 to 2023-11-26. Pushes: 78 total, peak 14 in a day. Pull requests: 46 total, peak 8 in a day. Issues: 0 total, peak 0 in a day. Comments: 12 total, peak 8 in a day. Recorded stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Recorded stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| YifanBian-bianya | 75 | 51 | 24 | 0 |
| xuc4 | 35 | 19 | 16 | 0 |
| gajicav | 11 | 1 | 1 | 5 |
| bracko-3 | 9 | 0 | 1 | 4 |
| willblaker | 9 | 0 | 3 | 3 |
| spiqi | 6 | 6 | 0 | 0 |
| Kozimjonk | 2 | 1 | 1 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.