A collection of tools and scripts used to communicate and emulate Electric Vehicle Communication Controllers (EVCC) and Supply Equipment Communication Controllers (SECC).
active 2023-11-09 → 2026-07-17 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 982 days from 2023-11-09 to 2026-07-17. Pushes: 54 total, peak 4 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 11 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 13 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| JakeMG-INL | 54 | 44 | 0 | 0 |
| rohdkw | 8 | 8 | 0 | 0 |
| inl-labtrack | 2 | 2 | 0 | 0 |
| pezluna | 1 | 0 | 0 | 0 |
| M4GNV5 | 1 | 0 | 1 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#103JakeMG-INL2026-07-16 20:42ISO-20 AC ScheduleExchange loses personality fidelity after the #98 DC schedule-read retirement
- Issue#82JakeMG-INL2026-07-01 21:44CableCheckRes: tree substitution skipped entirely on the FINISHED response drops non-isolation fields
- Issue#62JakeMG-INL2026-06-16 16:47Fail fast in conformance E2E when stale emulator processes are alive (cross-talk hang)
- Issue#30JakeMG-INL2026-06-03 00:11[Operator Console] Slice 3: SECC auth-stall + EVCC ongoing-timer defeat (ISO 15118-2)
- Issue#34JakeMG-INL2026-06-02 21:14[Operator Console] run_with_console can hang if the UI task fails early
- Issue#30JakeMG-INL2026-06-01 22:17SECC auth-stall + EVCC ongoing-timer defeat (ISO 15118-2)
- Issue#16JakeMG-INL2026-05-28 00:34[EXI Codec Swap] Slice 5: The swap — wire EXPy in, remove Exificient
- Issue#19JakeMG-INL2026-05-27 16:10[Conformance Test Framework] Slice 2: Migrate smoke scenarios to personality YAML, unxfail
- Issue#6JakeMG-INL2026-05-22 20:59[Personality Config] Slice 1: Loader plumbing, field migration, and default.yaml
- Issue#10JakeMG-INL2026-05-14 15:27[Personality Config] Slice 5: Cleanup, authoring guide, example personalities
- Releaserohdkw2024-10-31 20:04Updated PWM Circuit Board
- Releaserohdkw2024-10-23 16:53Initial Release
- Pull request#2M4GNV52024-09-12 16:43
- Issue#1pezluna2024-02-26 02:27Lack of detail information for PCB
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 13 stars here means stars gained during the window, not the repo's star count.