Skip to content

Infiltrator-Projects/MBLINK

View on GitHub ↗Related repositories →

C-first, cross-platform vehicle diagnostics for iPhone and Linux, with ELM327, OBD-II, ISO-TP, UDS and Mercedes-Benz diagnostics.

active 2026-08-29 → 2026-10-12 (UTC)

Complete coverage28,297 / 28,297 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-06 (UTC)
Events
145
Pushes
95
Pull requests
1
Issues
35
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 45 days from 2026-08-29 to 2026-10-12. Pushes: 95 total, peak 20 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 35 total, peak 6 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
The-First-Infiltrator949310
github-actions[bot]36200
chenyurong221000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.