Skip to content

Intermesh/docker-groupoffice

View on GitHub ↗Related repositories →

Docker image for Group-Office groupware

active 2023-08-21 → 2026-10-13 (UTC)

Complete coverage28,498 / 28,498 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-14 (UTC)
Events
339
Pushes
243
Pull requests
1
Issues
21
Stars
23
Forks
10

Activity over time

Daily event counts in the loaded window

Line chart, 1150 days from 2023-08-21 to 2026-10-13. Pushes: 243 total, peak 10 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 21 total, peak 3 in a day. Comments: 39 total, peak 6 in a day. Stars: 23 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
derjoachim17117100
mschering9472016
dom67705003
olegchensky4002
zine9993001
kemeris20003001
Abraka3002
edersong3003
czyt2001
shor08142001
julyusito2002
jh1970332001
itzonban2011
MrShippeR1001
theknigge1001
sanyaade-teachings1000
albertvisuals1001
nipsgur1001
danfossi1001
JodliDev1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 23 stars here means stars gained during the window, not the repo's star count.