Skip to content

Ismael-Software/proyecto-final-equipoverde

View on GitHub ↗Related repositories →

active 2025-11-11 → 2025-11-18 (UTC)

Complete coverage28,434 / 28,434 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-11 (UTC)
Events
14
Pushes
11
Pull requests
3
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 8 days from 2025-11-11 to 2025-11-18. Pushes: 11 total, peak 6 in a day. Pull requests: 3 total, peak 1 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
vakdev101000
ArlethC0071010
es377161-design1100
Moissssss3811010
Alecor01010

Recent activity

Latest issues, pull requests and releases

  • Pull request#3ArlethC0072025-11-14 04:45
  • Pull request#2Moissssss3812025-11-13 04:18
  • Pull request#1Alecor02025-11-12 00:17

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.