Skip to content

The open-source Cognitive Load Infrastructure. A unified life-management layer that integrates inventory, nutrition, health, and home maintenance into a seamless, predictive system.

active 2026-05-032026-05-09 (UTC)

Complete coverage26,461 / 26,461 hourly files (100%) · 2 absent upstream2023-08-152026-08-21 (UTC)
Events
24
Pushes
21
Pull requests
0
Issues
1
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 7 days from 2026-05-03 to 2026-05-09. Pushes: 21 total, peak 6 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 1 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Jales2161500
jarijalecats-bot3300
jaleshome-oss3300

Recent activity

Latest issues, pull requests and releases

  • Issue#13Jales22026-05-05 18:31
    fetchUsers removes auth token on backend failure

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.