Skip to content

JansthcirlU/Mermaid.NET.Flowcharts

View on GitHub ↗Related repositories →

Simple class library for modelling basic Mermaid Flowcharts, does not include any huge or complex features.

active 2024-11-202026-08-14 (UTC)

Complete coverage26,755 / 26,755 hourly files (100%) · 2 absent upstream2023-08-152026-09-02 (UTC)
Events
248
Pushes
79
Pull requests
41
Issues
60
Stars
2
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 633 days from 2024-11-20 to 2026-08-14. Pushes: 79 total, peak 13 in a day. Pull requests: 41 total, peak 8 in a day. Issues: 60 total, peak 7 in a day. Comments: 2 total, peak 1 in a day. Stars: 2 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
JansthcirlU17876382

Recent activity

Latest issues, pull requests and releases

  • Issue#68JansthcirlU2026-01-19 23:22
    Escape link text by default using quotes and replace inner quotes similarly to node text
  • Issue#68JansthcirlU2026-01-19 23:22
    Escape link text by default using quotes and replace inner quotes similarly to node text
  • Issue#68JansthcirlU2026-01-19 23:22
    Escape link text by default using quotes and replace inner quotes similarly to node text
  • Issue#68JansthcirlU2026-01-19 23:22
    Escape link text by default using quotes and replace inner quotes similarly to node text
  • Issue#66JansthcirlU2025-11-28 18:19
    Prep release 4.0.0 due to breaking changes
  • Issue#61JansthcirlU2025-11-28 18:13
    Fix duplicate node adds in graph and subgraph add link
  • Issue#63JansthcirlU2025-11-28 15:27
    Add non-generic Subgraph.Create factory method to be backwards compatible
  • Pull request#62JansthcirlU2025-11-28 14:05
  • Issue#61JansthcirlU2025-11-28 00:05
    Fix duplicate node adds in graph and subgraph add link
  • Issue#61JansthcirlU2025-11-28 00:05
    Fix duplicate node adds in graph and subgraph add link
  • ReleaseJansthcirlU2025-11-27 22:19
    Mermaid.NET.Flowcharts 3.1.0
  • Issue#58JansthcirlU2025-11-27 22:13
    Release 3.1.0
  • Pull request#55JansthcirlU2025-11-27 20:39
  • Issue#52JansthcirlU2025-11-27 20:17
    Add non-generic `Node.Create` factory method to be backwards compatible
  • Pull request#51JansthcirlU2025-08-25 21:13
  • Pull request#51JansthcirlU2025-08-25 21:08
  • ReleaseJansthcirlU2025-08-25 20:28
    Mermaid.NET.Flowcharts 3.0.0
  • Issue#48JansthcirlU2025-08-25 20:24
    Add editorconfig and format step in pipeline
  • Pull request#49JansthcirlU2025-08-25 20:24
  • Pull request#50JansthcirlU2025-08-25 20:15
  • Pull request#49JansthcirlU2025-08-25 20:01
  • Issue#48JansthcirlU2025-08-25 19:26
    Add editorconfig and format step in pipeline
  • Pull request#47JansthcirlU2025-08-25 16:04
  • Issue#46JansthcirlU2025-08-20 22:49
    Add support for configuration
  • Issue#32JansthcirlU2025-08-20 21:20
    Allow links to be defined on subgraphs

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.