Skip to content

JuliaGraphs/SimpleWeightedGraphs.jl

View on GitHub ↗Related repositories →

Edge-weighted graphs compatible with Graphs.jl

active 2024-03-232026-06-08 (UTC)

Partial coverage17,151 / 21,913 hourly files (78%) · 2 absent upstream · 4,761 failed, retryable2024-02-112026-08-12 (UTC)— sampled evenly across the window, so rankings and trends hold; absolute counts scale up.
Events
60
Pushes
17
Pull requests
17
Issues
3
Stars
4
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 808 days from 2024-03-23 to 2026-06-08. Pushes: 17 total, peak 8 in a day. Pull requests: 17 total, peak 12 in a day. Issues: 3 total, peak 1 in a day. Comments: 8 total, peak 2 in a day. Stars: 4 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
dependabot[bot]170161
gdalle11803
github-actions[bot]10910
codecov[bot]3003
mzy22401000
asinghvi171000
jpfairbanks1001
kockahonza1000

Recent activity

Latest issues, pull requests and releases

  • Pull request#65dependabot[bot]2025-12-28 16:33
  • Pull request#65dependabot[bot]2025-12-22 17:35
  • Pull request#65dependabot[bot]2025-12-22 17:35
  • Pull request#65dependabot[bot]2025-12-22 17:35
  • Issue comment#64dependabot[bot]2025-12-18 08:20
    Bump the all-julia-packages group across 1 directory with 2 updates
  • Pull request#64dependabot[bot]2025-12-15 18:13
  • Pull request#64dependabot[bot]2025-12-15 18:13
  • Pull request#63dependabot[bot]2025-12-15 10:57
  • Issue comment#61codecov[bot]2025-12-15 10:42
    Bump actions/checkout from 4 to 6
  • Pull request#62dependabot[bot]2025-12-15 10:39
  • Pull request#63dependabot[bot]2025-12-15 10:34
  • Pull request#63dependabot[bot]2025-12-15 10:34
  • Pull request#63dependabot[bot]2025-12-15 10:34
  • Pull request#63dependabot[bot]2025-12-15 10:34
  • Pull request#62dependabot[bot]2025-12-15 10:32
  • Pull request#62dependabot[bot]2025-12-15 10:32
  • Pull request#61dependabot[bot]2025-12-15 10:32
  • Pull request#61dependabot[bot]2025-12-15 10:32
  • Issue comment#60codecov[bot]2025-12-15 10:20
    Replace CompatHelper with dependabot
  • Releasegithub-actions[bot]2025-12-15 10:08
    v1.5.1
  • Pull request#57github-actions[bot]2025-12-13 01:19
  • Issue comment#55codecov[bot]2025-08-28 11:45
    MassInstallAction: Install the Downgrade workflow on this repository
  • Issue#54asinghvi172025-01-26 17:15
    No `reverse` implementation for SimpleWeightedDiGraph?
  • Issue comment#50gdalle2024-12-10 05:16
    Use `iszero(?)` instead of `?==zero(...)` for warning when adding edge, for Symbolics Num compatibility
  • Issue comment#49jpfairbanks2024-10-11 12:41
    Cannot add edge with Num type weights (from Symbolics)

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.