Skip to content

Construir un sistema de gestión de pruebas de software que soporte varios proyectos y diferentes roles (analista de pruebas, tester, gerente de pruebas y desarrolladores), es importante identificar los principales casos de uso.

active 2024-09-302025-08-02 (UTC)

Complete coverage26,549 / 26,549 hourly files (100%) · 2 absent upstream2023-08-152026-08-25 (UTC)
Events
268
Pushes
245
Pull requests
2
Issues
0
Stars
4
Forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 307 days from 2024-09-30 to 2025-08-02. Pushes: 245 total, peak 18 in a day. Pull requests: 2 total, peak 2 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 4 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Hilary-Madelein10510500
KBGR55686620
Yovin01666600
Yovin0016600
JamesRomero202200

Recent activity

Latest issues, pull requests and releases

  • Pull request#1KBGR552024-09-30 22:57
  • Pull request#1KBGR552024-09-30 22:57

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.