Skip to content

LLLLLyra/planning_controlling_simulation

View on GitHub ↗Related repositories →

a simple Apollo-based planning and controlling simulation, communicating with ROS

active 2023-08-15 → 2025-12-30 (UTC)

Complete coverage27,556 / 27,556 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-06 (UTC)
Events
41
Pushes
1
Pull requests
0
Issues
6
Stars
22
Forks
8

Activity over time

Daily event counts in the loaded window

Line chart, 869 days from 2023-08-15 to 2025-12-30. Pushes: 1 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 6 total, peak 3 in a day. Comments: 4 total, peak 2 in a day. Stars: 22 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
LLLLLyra6102
hbc20202001
Tavifeng1000
xyf273231001
zhangzhongzhong11000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 22 stars here means stars gained during the window, not the repo's star count.