欢迎来到数字奇迹之城的建设现场! 打造一款卓越的软件产品,就像建造一座宏伟、繁荣、充满活力的现代化都市。这绝非一人之功,而是需要一支由顶尖专家组成的精英团队,各司其职,紧密协作。本系列培训手册,将带您深入了解这座“数字城市”中每一个核心角色的职责、技能与思维方式。无论您想成为哪一位专家,这里都是您的起点。
active 2025-08-16 → 2025-09-28 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 44 days from 2025-08-16 to 2025-09-28. Pushes: 7 total, peak 7 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 1 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| xzwthu | 7 | 7 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.