Skip to content

Projeto desenvolvido pelos alunos do Start turma 2024.2 com foco em facilitar a ligação entre empresas fornecedoras de resíduos orgânicos e empresas coletoras de Biogás.

active 2024-07-18 → 2024-08-08 (UTC)

Complete coverage28,213 / 28,213 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-02 (UTC)
Events
13
Pushes
6
Pull requests
2
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 22 days from 2024-07-18 to 2024-08-08. Pushes: 6 total, peak 4 in a day. Pull requests: 2 total, peak 2 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
thallesvieiradelima4220
Ed-atj3300
LucasTavara1100

Recent activity

Latest issues, pull requests and releases

  • Pull request#1thallesvieiradelima2024-08-08 04:17
  • Pull request#1thallesvieiradelima2024-08-08 04:16

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.