Modular 3d engine with OpenGL support
active 2025-01-23 → 2025-11-16 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 298 days from 2025-01-23 to 2025-11-16. Pushes: 82 total, peak 13 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 5 total, peak 3 in a day. Comments: 2 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| MEgorov4 | 78 | 70 | 1 | 2 |
| drbdedevil | 12 | 12 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue comment#6MEgorov42025-11-02 10:24MSBuild -> Ninja
- Issue#11MEgorov42025-10-26 16:57Сделать возможность перезагружать контекст
- Issue comment#8MEgorov42025-10-26 16:55Убрать зависимость Logger от ProjectModule и добавить настройку outputPath и название log-файла который он будет заполнять
- Issue#9MEgorov42025-10-26 12:18Убрать зависимость FileystemModule от ProjectModule и вынести работу с путями по проекту в ProjetModule
- Pull request#7MEgorov42025-08-14 14:32
- Issue#3MEgorov42025-07-01 22:28Refactoring ecs module
- Issue#2MEgorov42025-07-01 22:04Rework render module
- Issue#1MEgorov42025-07-01 22:03Rework render system
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.