Skip to content

MajorIn-ABO/MajorIn_BE_SERVER

View on GitHub ↗Related repositories →

🎓 캡스톤 디자인 - MajorIn 학과 중심 커뮤니티 BE-SERVER Repository 🎓

active 2024-04-19 → 2024-08-06 (UTC)

Archive files: complete28,832 / 28,832 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-28 (UTC)Some event types are under-captured. Data limits →
Events
194
Pushes
59
Pull requests
50
Issues
67
Recorded stars
0
Recorded forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 110 days from 2024-04-19 to 2024-08-06. Pushes: 59 total, peak 7 in a day. Pull requests: 50 total, peak 8 in a day. Issues: 67 total, peak 13 in a day. Comments: 0 total, peak 0 in a day. Recorded stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
cho-ja-young17659500

Recent activity

Latest issues, pull requests and releases

Code vs talk

PR and issue events in 2024, before the 2026 capture fade. Counts events, bots included.

0.75PR events per issue eventcode and talk in balance

PR events and issues arrive at about the same rate, with almost no reviews on GitHub.

0.00 reviews per PR event (0 reviews)

In 2024 this repository logged 50 pull request events and 67 issue events, 0.75 PR events per issue event, and 0.00 reviews per PR event. Reading: code and talk in balance.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.