Skip to content

Open House Management Platform for NUST-SEECS: Streamlining the Final Year Project (FYP) evaluation process. Assign projects to evaluators, manage preferences, and ensure fair assessments. Built with Laravel (server side), React (client side), and MySQL (database).

active 2023-12-202023-12-21 (UTC)

Complete coverage26,794 / 26,794 hourly files (100%) · 2 absent upstream2023-08-152026-09-04 (UTC)
Events
15
Pushes
13
Pull requests
0
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 2 days from 2023-12-20 to 2023-12-21. Pushes: 13 total, peak 8 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Me-AU131300

Recent activity

Latest issues, pull requests and releases

No issue or PR events — this repo's activity is pushes only.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.