Your coursework planner
active 2024-10-09 → 2025-04-17 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 191 days from 2024-10-09 to 2025-04-17. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 188 total, peak 25 in a day. Comments: 20 total, peak 4 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| Millena28 | 208 | 0 | 0 | 20 |
Recent activity
Latest issues, pull requests and releases
- Issue comment#167Millena282025-04-17 07:34[PD] Linkedin Social Selling Index
- Issue#167Millena282025-04-17 07:29[PD] Linkedin Social Selling Index
- Issue#165Millena282025-04-05 22:2104 CIP Python Control Flow
- Issue#164Millena282025-04-05 22:2102 Complete Sprint 3 coursework
- Issue#163Millena282025-04-05 22:2009 Asking for feedback
- Issue#162Millena282025-04-05 22:1807 Writing a meeting request email
- Issue#161Millena282025-04-05 22:1702 Complete Sprint 2 coursework
- Issue#160Millena282025-04-05 22:1605 📝 Code review
- Issue#159Millena282025-04-05 22:16🧑🏾⚖️ Check module success criteria
- Issue#158Millena282025-04-05 22:1605 📝 Code review
- Issue#157Millena282025-04-05 22:1503 Complete Sprint 1 Coursework
- Issue#156Millena282025-04-05 22:1501 CIP Intro to Python
- Issue#155Millena282025-04-05 22:1401 You must always start with the prep
- Issue#154Millena282025-04-05 22:1401 You must always start with the prep
- Issue#153Millena282025-04-05 22:1401 You must always start with the prep
- Issue#152Millena282025-04-05 22:1401 You must always start with the prep
- Issue#151Millena282025-04-05 22:13🫱🏾🫲🏿 Step1: Onboarding
- Issue#149Millena282025-04-05 22:1001 You must always start with the prep
- Issue#148Millena282025-04-05 22:0706 Prepare to enroll as a trainee
- Issue#147Millena282025-04-05 22:0704 Prepare for the Asking Questions workshop
- Issue#146Millena282025-04-05 22:0703 Form Controls
- Issue#145Millena282025-04-05 22:0601 Do the prep
- Issue#144Millena282025-04-05 22:0509 Manage time with your calendar
- Issue#143Millena282025-04-05 21:5105 Tell us about yourself using Github
- Issue#142Millena282025-04-05 21:4502 Check module success criteria
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.