GPEP with Lake Temperature Aware Models. a fork of the global probabilistic estimation package for development during summer 2026 gis master's thesis
active 2023-08-21 → 2026-05-28 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 1012 days from 2023-08-21 to 2026-05-28. Pushes: 12 total, peak 2 in a day. Pull requests: 29 total, peak 4 in a day. Issues: 6 total, peak 3 in a day. Comments: 19 total, peak 4 in a day. Stars: 11 total, peak 2 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| guoqiang-tang | 47 | 11 | 22 | 10 |
| andywood | 12 | 1 | 4 | 5 |
| DaveCasson | 8 | 0 | 3 | 4 |
Recent activity
Latest issues, pull requests and releases
- Pull request#22andywood2025-09-07 22:12
- Issue comment#22andywood2025-09-07 22:11A new release after CONUS forcing development
- Pull request#23guoqiang-tang2025-04-24 01:48
- Pull request#23guoqiang-tang2025-04-24 01:48
- Pull request#22guoqiang-tang2025-03-14 12:11
- Issue comment#21guoqiang-tang2025-01-24 04:33Developments
- Pull request#21andywood2025-01-23 17:38
- Pull request#21guoqiang-tang2025-01-21 20:41
- Pull request#20guoqiang-tang2025-01-21 19:34
- Pull request#20guoqiang-tang2025-01-21 19:33
- Issue comment#18andywood2024-07-16 18:26Add cross validation ability for ensemble estimation
- Issue#19andywood2024-07-16 18:23support downscaling and prediction applications through clean separation of train/validate and test/predict modes
- Issue#18guoqiang-tang2024-07-16 18:11Add cross validation ability for ensemble estimation
- Issue#17guoqiang-tang2024-07-16 17:26Adding restart ability
- Issue comment#16guoqiang-tang2024-03-08 17:24Allow missing values in input data
- Issue comment#16andywood2024-03-08 06:15Allow missing values in input data
- Issue#16guoqiang-tang2024-03-07 22:44Allow missing values in input data
- Pull request#13guoqiang-tang2024-03-07 17:22
- Issue comment#13guoqiang-tang2024-03-07 17:22Addition of Empirical CDF transform
- Issue comment#14guoqiang-tang2024-03-07 16:48updating GPEP readme
- Pull request#14guoqiang-tang2024-03-07 16:48
- Pull request#15guoqiang-tang2024-03-07 16:46
- Issue comment#13DaveCasson2024-03-07 15:43Addition of Empirical CDF transform
- Pull request#15andywood2024-03-07 03:53
- Issue comment#14guoqiang-tang2024-03-06 17:36updating GPEP readme
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 11 stars here means stars gained during the window, not the repo's star count.