极客挑战赛地图后端
active 2025-11-20 → 2025-12-16 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 27 days from 2025-11-20 to 2025-12-16. Pushes: 12 total, peak 5 in a day. Pull requests: 3 total, peak 2 in a day. Issues: 5 total, peak 4 in a day. Comments: 26 total, peak 8 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| Copilot | 29 | 0 | 0 | 26 |
| minikites8 | 20 | 12 | 3 | 0 |
Recent activity
Latest issues, pull requests and releases
- Pull request#16minikites82025-12-10 10:58
- Issue#13minikites82025-12-05 17:02[Backend] 高并发与异步处理:Redis 队列集成及 /api/route 压测
- Issue#11minikites82025-12-05 17:01[Backend] 统一多源交通数据接入与清洗管道(设备 / 前端 / 算法服务)
- Issue#11minikites82025-12-05 17:01[Backend] 统一多源交通数据接入与清洗管道(设备 / 前端 / 算法服务)
- Issue#11minikites82025-12-05 17:01[Backend] 统一多源交通数据接入与清洗管道(设备 / 前端 / 算法服务)
- Issue#2minikites82025-11-23 14:48[Chore] 初始化项目框架并配置数据库
- Pull request#8minikites82025-11-20 09:42
- Pull request#8minikites82025-11-20 09:42
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.