Capstone repository for OCD Rat Infrastructure
active 2025-09-29 → 2026-04-14 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 198 days from 2025-09-29 to 2026-04-14. Pushes: 214 total, peak 18 in a day. Pull requests: 97 total, peak 15 in a day. Issues: 123 total, peak 15 in a day. Comments: 25 total, peak 4 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| NathanPerry11 | 118 | 44 | 28 | 4 |
| agoodyer | 77 | 44 | 14 | 5 |
| leovugert | 76 | 21 | 20 | 0 |
| TimPokanai | 75 | 38 | 13 | 3 |
| JeremyOrr4 | 67 | 25 | 22 | 6 |
| github-actions[bot] | 42 | 42 | 0 | 0 |
| github-advanced-security[bot] | 9 | 0 | 0 | 7 |
| MarHerRiv | 4 | 0 | 0 | 0 |
| andy2131 | 1 | 0 | 0 | 0 |
| felix-hurst | 1 | 0 | 0 | 0 |
| MithunPara | 1 | 0 | 0 | 0 |
| MarcosNVTech | 1 | 0 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Pull request#430leovugert2026-04-07 04:14
- Issue#399TimPokanai2026-04-07 02:54Peer Review - VnV Report - Some tests missing specific inputs
- Issue#400TimPokanai2026-04-07 02:54Peer Review - VnV Report lack of automated frontend unit testing
- Issue#401TimPokanai2026-04-07 02:54Peer Review - Unit Test Traceability (VnV Report)
- Issue#43TimPokanai2026-04-07 02:54Peer Review - POC fails to demonstrate scalability
- Issue#241TimPokanai2026-04-07 02:54Peer Review - Combine the two supervisor-related approaches to SRS Verification
- Pull request#427TimPokanai2026-04-07 02:52
- Pull request#425leovugert2026-04-07 02:12
- Issue#330NathanPerry112026-04-07 02:12Peer Review - Inconsistent Module Naming in MIS
- Issue#329NathanPerry112026-04-07 02:12Peer Review - MG 4.1 AC1 can be split into multiple items
- Issue#328NathanPerry112026-04-07 02:12Peer Review - Inconsistency in which modules fall under which level
- Pull request#426JeremyOrr42026-04-07 00:45
- Issue#224leovugert2026-04-06 23:11Peer Review - Contingency Plan Required for API Outages
- Pull request#420JeremyOrr42026-04-06 20:02
- Issue#223leovugert2026-04-03 23:43Peer Review - Missing personal info on Personas
- Issue#222leovugert2026-04-03 23:43Peer Review - Justify Out-of-Scope Hazards
- Pull request#416NathanPerry112026-03-28 23:18
- Issue#373leovugert2026-03-28 22:17VnV Report Rev 0 - Unit Testing
- Issue#374leovugert2026-03-28 22:17VnV Report Rev 0 - Changes Due to Testing
- Issue#386leovugert2026-03-28 22:17Jeremy Reflection Question
- Pull request#412NathanPerry112026-03-27 00:55
- Pull request#412NathanPerry112026-03-27 00:52
- Pull request#411NathanPerry112026-03-26 22:22
- Pull request#409TimPokanai2026-03-26 21:19
- Pull request#408agoodyer2026-03-26 19:04
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.