Pepper stands for "Plan Progress Review", a project management tool
active 2024-11-28 → 2026-08-26 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 637 days from 2024-11-28 to 2026-08-26. Pushes: 51 total, peak 8 in a day. Pull requests: 2 total, peak 1 in a day. Issues: 7 total, peak 2 in a day. Comments: 7 total, peak 4 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
Recent activity
Latest issues, pull requests and releases
- Issue#58ncouvert2026-05-26 12:36Add feedback from the Gantt for unauthorized task moves
- Issue comment#6ncouvert2026-04-10 11:11Use "00:00" as default value for `Start Time` and "23:59" as default value for `End Time`
- Issue comment#5ncouvert2026-04-10 11:05In calendar widget, improve default values of "Start Date", "End Date", "Start Time" and "End Time"
- Issue comment#5lredor2026-04-10 10:16In calendar widget, improve default values of "Start Date", "End Date", "Start Time" and "End Time"
- Issue comment#6lredor2026-04-10 10:03Use "00:00" as default value for `Start Time` and "23:59" as default value for `End Time`
- Issue#35ncouvert2026-03-27 08:11Workpackages created from another in the Gantt panel are one day shorter than expected
- Issue#25ncouvert2026-03-06 08:41Tasks created from the menus can be created on non working days
- Issue comment#16ncouvert2026-02-10 10:49The task label is badly displayed in gantt
- Issue comment#14ncouvert2026-02-03 14:36Week number are displayed on top of the line separating two weeks
- Issue#17lfasani2026-02-03 09:56The specifier should be able to configure the color of the Gantt Task
- Issue#15lfasani2026-02-03 09:37Make zoom level and time scale uncorrelated
- Issue#9lredor2025-07-28 14:22Add options on task dependency
- Issue#7lredor2025-07-28 14:02The selected zoom level is not necessarily ideal
- Pull request#4lfasani2025-01-24 14:05
- Pull request#3lfasani2024-11-28 16:38
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.