Skip to content

PowerSystem2024/CapybaraFilms_ProyectoTercerSemestre

View on GitHub ↗Related repositories →

App de gestión de cine en Python. Permite registrar usuarios, comprar entradas, elegir asientos y combos.

active 2025-04-29 → 2026-03-04 (UTC)

Complete coverage28,222 / 28,222 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-02 (UTC)
Events
174
Pushes
51
Pull requests
10
Issues
10
Stars
6
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 310 days from 2025-04-29 to 2026-03-04. Pushes: 51 total, peak 14 in a day. Pull requests: 10 total, peak 4 in a day. Issues: 10 total, peak 6 in a day. Comments: 1 total, peak 1 in a day. Stars: 6 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
MerAtim271751
anaprg0516930
EzequielQ20048700
Mariana37267610
wandaoriana6410
Melina-Aguilar4400
NicolasMercado14400

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 6 stars here means stars gained during the window, not the repo's star count.