Skip to content

Proyecto-Integrador-I-ISPC/Full-Stack

View on GitHub ↗Related repositories →

GRUPO 18 --- Repositorio institucional ISPC para la realización del módulo Programación Full Stack.

active 2025-08-24 → 2025-10-16 (UTC)

Previously known as +1 brief name: Proyecto-Integrador-I-ISPC/Front-end. Linked by GitHub's repository id. Older names can be missing when an old name was later reused (e.g. forked back). Charts on this page cover this name only.

Archive files: complete28,837 / 28,837 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-28 (UTC)Some event types are under-captured. Data limits →
Events
183
Pushes
42
Pull requests
42
Issues
31
Recorded stars
0
Recorded forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 54 days from 2025-08-24 to 2025-10-16. Pushes: 42 total, peak 8 in a day. Pull requests: 42 total, peak 8 in a day. Issues: 31 total, peak 13 in a day. Comments: 10 total, peak 3 in a day. Recorded stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
abipicone8631250
mauripucheta116393
fernandez-ariel8430
netlify[bot]bot6006
Astridlup4220
Mavillan-Git4111
Irinap343120

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.