Skip to content

RIT-Software-Engineering/RIT-SE-Senior-Project

View on GitHub ↗Related repositories →

The Senior Project Website for RIT SE hosted at senior project.se.rit.edu

active 2023-08-23 → 2026-10-28 (UTC)

Complete coverage28,134 / 28,134 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-30 (UTC)
Events
1.5K
Pushes
745
Pull requests
204
Issues
164
Stars
5
Forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 1163 days from 2023-08-23 to 2026-10-28. Pushes: 745 total, peak 17 in a day. Pull requests: 204 total, peak 11 in a day. Issues: 164 total, peak 22 in a day. Comments: 156 total, peak 10 in a day. Stars: 5 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
ayden-boyko2001153818
sr2072128603123
tjp4618109741610
bdh50609959258
blaqat7443511
ibanrohazz7255010
RogerTheRabbit5625179
all4content530024
atparsec514521
andymeneely45977
jltlm444210
dependabot[bot]433373
Rtyujklop392618
Marrufof362225
AshRoushinko292323
lb5562282511
yyi5708262330
llf5185216110
vama-rit181260
nrp4309161600

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 5 stars here means stars gained during the window, not the repo's star count.