Rex-Embodied 基于Rex-Omni(3B 参数多模态大语言模型)进行调整构建,将"看见目标"到"生成并执行机器人抓取计划"的全链路封装为可部署的工程系统。目前工作集中在具身生成数据+自动标注,目前以桌面场景我们能够在先前我们已经收集或者生成的图像数据上源源不断地进行高仿合成。支持原生Rex-Omni的Detection / Pointing / Segment / Grounding基础上,自动化复杂关系(如堆叠、遮挡)的spati
active 2026-04-01 → 2026-05-28 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 58 days from 2026-04-01 to 2026-05-28. Pushes: 10 total, peak 3 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| RWLinno | 10 | 10 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.