Do:Rering PROJECT JAVA(SPRINGBOOT) BACKEND
active 2024-03-05 → 2025-07-29 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 512 days from 2024-03-05 to 2025-07-29. Pushes: 38 total, peak 6 in a day. Pull requests: 61 total, peak 9 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Recorded stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Recorded stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
Recent activity
Latest issues, pull requests and releases
PR door speed
Human PRs opened in 2024 (30), closes followed to the end of June 2025. Closed means merged or rejected; bots and Copilot excluded.
Half of the human pull requests opened here in 2024 were closed within 8 minutes; 10% were still open at the end of June 2025.
Of 30 human pull requests opened in 2024: 90% closed within a day, 0% closed in 1 to 7 days, 0% closed in 7 to 30 days, 0% closed after 30 days, 10% still open.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.