Rebabit/Permutation-Flow-Shop-Scheduling-Problem-by-Heuristic-and-Metaheuristic-Algorithm
View on GitHub ↗Related repositories →Solution to the PFSP problem. The final project of Optimization Methods (BIT北理工,最优化,流水车间调度)
active 2023-08-25 → 2025-02-17 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 543 days from 2023-08-25 to 2025-02-17. Pushes: 1 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 6 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| Rebabit | 1 | 1 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 6 stars here means stars gained during the window, not the repo's star count.