Mahlwerk is a make-believe coffee machine manufacturer in need of mobilizing its business processes. Realize the power of SAP Mobile Services through this end-to-end sample application designed to highlight the capabilities of native (SAP BTP SDK for Android/iOS) and cross-platform (Mobile Development Kit/SAP Mobile Cards) applications developed through use cases commonly found in the industry.
active 2024-01-22 → 2025-08-27 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 584 days from 2024-01-22 to 2025-08-27. Pushes: 1 total, peak 1 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 5 total, peak 3 in a day. Comments: 4 total, peak 3 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| sap-repository-linter[bot] | 9 | 0 | 0 | 4 |
| jitendrakansal | 3 | 1 | 1 | 0 |
Recent activity
Latest issues, pull requests and releases
- Pull request#21jitendrakansal2025-03-10 14:26
- Issue comment#20sap-repository-linter[bot]2025-02-20 21:49FAILED: Repository Linter Issue: rl-assigned_teams
- Issue#20sap-repository-linter[bot]2025-02-20 21:49FAILED: Repository Linter Issue: rl-assigned_teams
- Issue comment#13sap-repository-linter[bot]2025-02-19 00:54[rl-assigned_teams-2] Violation against OSS Rules of Play
- Issue#13sap-repository-linter[bot]2025-02-19 00:54[rl-assigned_teams-2] Violation against OSS Rules of Play
- Issue comment#14sap-repository-linter[bot]2025-02-19 00:54[rl-assigned_teams-3] Violation against OSS Rules of Play
- Issue#14sap-repository-linter[bot]2025-02-19 00:54[rl-assigned_teams-3] Violation against OSS Rules of Play
- Issue#15sap-repository-linter[bot]2025-02-19 00:54[rl-assigned_teams-1] Violation against OSS Rules of Play
- Issue comment#15sap-repository-linter[bot]2025-02-19 00:54[rl-assigned_teams-1] Violation against OSS Rules of Play
- Issue#20sap-repository-linter[bot]2025-02-17 21:04FAILED: Repository Linter Issue: rl-assigned_teams
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.