Skip to content

𝗣𝗿𝗼𝗷𝗲𝘁𝗼 𝗜𝗻𝘁𝗲𝗴𝗿𝗮𝗱𝗼𝗿: 𝗗𝗲𝘀𝗲𝗻𝘃𝗼𝗹𝘃𝗶𝗺𝗲𝗻𝘁𝗼 𝗱𝗲 𝗦𝗶𝘀𝘁𝗲𝗺𝗮𝘀 𝗢𝗿𝗶𝗲𝗻𝘁𝗮𝗱𝗼𝘀 𝗮 𝗪𝗲𝗯 (𝗦𝗘𝗡𝗔𝗖-𝗦𝗣) Desenvolvimento da plataforma de agendamento para nutricionistas. Projeto pautado em metodologias ágeis (Scrum), com separação rigorosa entre Backend e Frontend e persistência de dados estruturada.

active 2026-03-312026-05-27 (UTC)

Complete coverage27,247 / 27,249 hourly files (100%) · 2 absent upstream2023-08-152026-09-23 (UTC)
Events
65
Pushes
23
Pull requests
12
Issues
21
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 58 days from 2026-03-31 to 2026-05-27. Pushes: 23 total, peak 6 in a day. Pull requests: 12 total, peak 8 in a day. Issues: 21 total, peak 11 in a day. Comments: 1 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
jovemOG-Dev27680
lima-gabr13710
marcosboe9420
debbySantos4400
tjatoba3110
Copilot2101

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.