𝗣𝗿𝗼𝗷𝗲𝘁𝗼 𝗜𝗻𝘁𝗲𝗴𝗿𝗮𝗱𝗼𝗿 – 𝗗𝗲𝘀𝗲𝗻𝘃𝗼𝗹𝘃𝗶𝗺𝗲𝗻𝘁𝗼 𝗘𝘀𝘁𝗿𝘂𝘁𝘂𝗿𝗮𝗱𝗼 𝗱𝗲 𝗦𝗶𝘀𝘁𝗲𝗺𝗮𝘀 (𝗦𝗘𝗡𝗔𝗖-𝗦𝗣) Repositório dedicado ao desenvolvimento da aplicação do projeto integrador, em transição para Angular, com foco em boas práticas e organização de código.
active 2025-09-09 → 2025-11-25 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 78 days from 2025-09-09 to 2025-11-25. Pushes: 56 total, peak 8 in a day. Pull requests: 28 total, peak 5 in a day. Issues: 0 total, peak 0 in a day. Comments: 2 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| gabriel-fausto | 47 | 30 | 9 | 0 |
| jovemOG-Dev | 43 | 21 | 18 | 2 |
| lima-gabr | 5 | 4 | 1 | 0 |
| marcosboe | 1 | 1 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.