KSA Contract Manager
active 2025-12-30 → 2026-05-05 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 127 days from 2025-12-30 to 2026-05-05. Pushes: 45 total, peak 13 in a day. Pull requests: 15 total, peak 6 in a day. Issues: 32 total, peak 6 in a day. Comments: 1 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| SaphireFalcon | 93 | 45 | 15 | 1 |
Recent activity
Latest issues, pull requests and releases
- Issue#127SaphireFalcon2026-05-03 04:23Mission Planner Tab - Part 3
- Issue#129SaphireFalcon2026-05-02 08:04Mission Planner Tab - Part 4
- Pull request#126SaphireFalcon2026-04-05 07:07
- Issue#116SaphireFalcon2026-01-13 14:30Migration: UID fields
- Issue comment#97SaphireFalcon2026-01-11 14:29[Epic] Create migration
- Issue#112SaphireFalcon2026-01-11 11:39Figure a way make the editing right panel show table at full width
- Issue#111SaphireFalcon2026-01-11 08:57Find how to prevent mapped keys to be triggered when typing text
- Issue#109SaphireFalcon2026-01-11 03:42Add `sealed` to classes
- Issue#101SaphireFalcon2026-01-11 01:09Add top-level tabs to Contract Management Window
- Issue#54SaphireFalcon2026-01-11 01:08Make contract in left panel highlighted if shown on the right in details panel
- Issue#102SaphireFalcon2026-01-11 01:08Update management tab
- Pull request#107SaphireFalcon2026-01-11 01:08
- Pull request#107SaphireFalcon2026-01-10 13:58
- Issue#103SaphireFalcon2026-01-10 05:41Create a new "mission planner" tab
- Issue#102SaphireFalcon2026-01-10 05:10Update management tab
- Issue#101SaphireFalcon2026-01-10 04:59Add top-level tabs to Contract Management Window
- Pull request#100SaphireFalcon2026-01-10 04:46
- Issue#98SaphireFalcon2026-01-09 15:09Do play-test and test load/save
- Issue#95SaphireFalcon2026-01-08 11:29Update Action to be used by MissionBlueprints as well
- Pull request#90SaphireFalcon2026-01-07 12:06
- Issue#89SaphireFalcon2026-01-07 11:57Create optional requirement
- Pull request#86SaphireFalcon2026-01-04 04:04
- Issue#85SaphireFalcon2026-01-04 03:15Find a way to show Contract Manager windows when closed
- Issue#84SaphireFalcon2026-01-04 03:13Release v0.2.0
- Issue#83SaphireFalcon2026-01-04 03:08Add `offerContract` `ActionType`
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.