本项目旨在通过还原一个项目从 0 到 1 的全生命周期,深度探索基础功能在复杂场景下的落地实践。我们不仅会复现互联网大厂及社区主流的技术方案,更通过多维度对比,深度剖析不同架构和方案的优劣与适用边界。 项目最终将进入非营利性试运营阶段,通过真实运行环境捕捉潜在缺陷与性能瓶颈。我们坚持“在实践中发现问题,在迭代中驱动完善”的原则,持续打磨细节�
active 2025-12-27 → 2026-02-15 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 51 days from 2025-12-27 to 2026-02-15. Pushes: 97 total, peak 17 in a day. Pull requests: 18 total, peak 3 in a day. Issues: 0 total, peak 0 in a day. Comments: 15 total, peak 8 in a day. Stars: 7 total, peak 2 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| unicornshjl | 53 | 50 | 3 | 0 |
| colour-y | 18 | 12 | 4 | 0 |
| Copilot | 18 | 0 | 0 | 15 |
| senak1129 | 13 | 13 | 0 | 0 |
| Hei-MaoM | 11 | 7 | 4 | 0 |
| 190y | 10 | 7 | 3 | 0 |
| 1708737115 | 6 | 4 | 2 | 0 |
| GongNanyue | 2 | 1 | 1 | 0 |
| KASW-UI | 2 | 1 | 1 | 0 |
| cjlll819 | 1 | 1 | 0 | 0 |
| XqAiyee7 | 1 | 1 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 7 stars here means stars gained during the window, not the repo's star count.