Skip to content

ShimiTheFirst/sprint-capacity-planner

View on GitHub ↗Related repositories →

Simple team utility app for better sprint planning. Supports team member and sprint management. In each sprint, tasks can be created for a team member filling its capacity.

active 2025-06-01 → 2025-09-27 (UTC)

Complete coverage27,464 / 27,464 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-02 (UTC)
Events
24
Pushes
7
Pull requests
2
Issues
8
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 119 days from 2025-06-01 to 2025-09-27. Pushes: 7 total, peak 5 in a day. Pull requests: 2 total, peak 2 in a day. Issues: 8 total, peak 5 in a day. Comments: 1 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
ShimiTheFirst8510
LukssOne5000
lausmma24211
Copilot3000
fletunner1101000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.