Skip to content

active 2023-11-242026-02-10 (UTC)

Complete coverage26,610 / 26,610 hourly files (100%) · 2 absent upstream2023-08-152026-08-27 (UTC)
Events
67
Pushes
0
Pull requests
0
Issues
55
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 810 days from 2023-11-24 to 2026-02-10. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 55 total, peak 23 in a day. Comments: 7 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

Recent activity

Latest issues, pull requests and releases

  • Issue#69jfguidalesc2026-02-10 17:35
    Integración desde Autodesk Construction Cloud® para generar la ejecución física en ADPRO
  • Issue#66jfguidalesc2026-02-10 16:21
    Mejoras en la programación de ADPRO Calendario laboral con horario configurable por horas y nuevo informe de flujo de costo programado
  • Issue#65jfguidalesc2026-02-10 16:09
    Integración ADPRO - Autodesk Construction Cloud®
  • Issue#63jfguidalesc2026-02-10 15:46
    Gestión autónoma de edición de proyectos y sucursales
  • Issue#56rodriguezmonicadelpilar2025-12-30 23:17
    Nueva página de registro masivo de archivos
  • Issue#54rodriguezmonicadelpilar2025-11-19 23:44
    Nueva correspondencia interna
  • Issue#53rodriguezmonicadelpilar2025-11-19 23:44
    Nueva correspondencia entrante
  • Issue#52rodriguezmonicadelpilar2025-11-19 23:43
    Adjuntos de archivo a Anticipos a terceros
  • Issue#50nestorcastanedaromer2025-06-17 23:18
    Solicitud de prestamos desde mi bitákora.
  • Issue#48jfguidalesc2025-06-17 15:58
    Migración por contratista caja menor
  • Issue#46jfguidalesc2025-06-17 15:51
    Inventarios off line - dispositivos móviles
  • Issue#45jfguidalesc2025-06-17 15:49
    Dashboard control ADPRO
  • Issue#44jfguidalesc2025-06-17 15:15
    Minutas parametrizables para OC
  • Issue#43jfguidalesc2025-06-17 15:11
    Migración desde Excel de preajustes puntuales de proyección
  • Issue#40jfguidalesc2025-06-17 15:02
    Migración de salidas de almacén desde Excel
  • Issue#39deynerromero2025-06-17 13:34
    Datamart SST
  • Issue comment#17jfergv2024-12-11 11:11
    Otrosí por cambio en porcentaje de anticipo
  • Issue comment#10jfguidalesc2024-08-02 21:03
    Migración ajustes puntuales de proyección.
  • Issue comment#10Germn19962024-05-28 22:29
    Migración ajustes puntuales de proyección.
  • Issue#38jfguidalesc2024-05-22 15:04
    Nuevo informe consolidado de otrosíes en contratos
  • Issue#37jfguidalesc2024-05-22 15:01
    Filtro de insumos con precio fijo en insumos presupuesto
  • Issue#2jfguidalesc2024-04-15 20:32
    Solicitud de traslados de almacen
  • Issue comment#1MichelleParra2024-03-07 21:17
    Nueva versión cuentas por pagar entradas con cargue del costo en la causación masiva
  • Issue comment#1DanielHigueraFuerte2024-03-01 19:39
    Nueva versión cuentas por pagar entradas con cargue del costo en la causación masiva
  • Issue#32jfguidalesc2024-02-15 19:51
    Prueba

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.