active 2023-11-23 → 2025-06-17 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 573 days from 2023-11-23 to 2025-06-17. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 18 total, peak 9 in a day. Comments: 1 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| deynerromero | 19 | 0 | 0 | 1 |
Recent activity
Latest issues, pull requests and releases
- Issue#22deynerromero2025-06-17 13:07Pagina de reasignación de actividades
- Issue#20deynerromero2025-06-17 13:04Cierre masivo de actividades
- Issue#18deynerromero2024-03-12 16:03Integración SGD - documentos adjuntos
- Issue#16deynerromero2024-03-12 16:01Optimización en el tiempo de la Generación de cambios (modificaciones y simulación)
- Issue#15deynerromero2024-03-12 16:01Optimización informe estado del proyecto
- Issue#14deynerromero2024-03-11 15:36Listado de proyectos para aprobar a ejecución
- Issue comment#3deynerromero2024-03-11 15:35App de ejecucion de actividades
- Issue#13deynerromero2024-03-11 15:33Integración SGC - Planes de acción
- Issue#12deynerromero2024-03-11 15:33Integración SGD - documentos adjuntos
- Issue#11deynerromero2024-03-11 15:32Rediseño y mejora de experiencia de usuario en el Portafolio de proyectos
- Issue#10deynerromero2024-03-11 15:25Integración ADPRO
- Issue#9deynerromero2024-03-11 15:25Prioridad en las actividades
- Issue#8deynerromero2024-03-11 15:24Optimización informe Gestión de la actividad
- Issue#7deynerromero2024-03-11 15:24Optimización de cronogramas
- Issue#6deynerromero2024-03-11 15:22Nuevas páginas de aprobar proyecto a planificación y ejecución
- Issue#5deynerromero2023-12-11 13:30Rediseño portafolio de proyectos
- Issue#4deynerromero2023-12-11 13:27Gestión de planes de accion para el manejo de riesgos
- Issue#3deynerromero2023-12-11 13:23App de ejecucion de actividades
- Issue#2deynerromero2023-12-04 14:12Identificación y gestión de riesgos positivos - oportunidades
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.