A project discovery and management platform that helps winning projects continue building between hackathons.
active 2025-11-09 → 2026-06-25 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 229 days from 2025-11-09 to 2026-06-25. Pushes: 98 total, peak 12 in a day. Pull requests: 21 total, peak 4 in a day. Issues: 10 total, peak 7 in a day. Comments: 12 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| sacha-l | 122 | 94 | 17 | 1 |
| vercel[bot] | 11 | 0 | 0 | 11 |
| CreedsCode | 5 | 2 | 3 | 0 |
| thewoodfish | 2 | 2 | 0 | 0 |
| Kasionchen | 1 | 0 | 1 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#198sacha-l2026-06-25 22:30Process gap: admin panel JS errors not caught before prod deploy
- Issue comment#167vercel[bot]2026-05-23 09:46fix(audio): mute toggle works on mobile (pause instead of setVolume)
- Issue comment#128sacha-l2026-05-22 17:50security: add helmet middleware for X-Frame-Options / X-Content-Type-Options / etc.
- Pull request#154sacha-l2026-05-22 14:03
- Issue comment#150vercel[bot]2026-05-22 02:28feat(programs): non-member apply flow — emails the team (#140)
- Pull request#147sacha-l2026-05-22 01:49
- Pull request#146sacha-l2026-05-22 01:12
- Pull request#144sacha-l2026-05-22 00:42
- Pull request#144sacha-l2026-05-21 23:37
- Pull request#111sacha-l2026-05-21 05:26
- Issue comment#114vercel[bot]2026-05-21 05:18feat(projects): 'What's next, milestone 3?' continuation form
- Issue comment#111vercel[bot]2026-05-21 04:59feat(admin): onboarding empty-state + invite-copy button
- Issue comment#103vercel[bot]2026-05-20 17:41feat(programs): Luma CSV signup import with dry-run preview
- Issue#93sacha-l2026-05-20 13:37feat: backfill programs as canonical event/track entity (Phase 1)
- Issue comment#89vercel[bot]2026-05-19 18:06feat: single-use sign-in nonces + message expiry (#88)
- Issue#72sacha-l2026-04-30 00:47revamp-P2-06: end-to-end alpha rehearsal #2 — the loop closes
- Issue#72sacha-l2026-04-30 00:47revamp-P2-06: end-to-end alpha rehearsal #2 — the loop closes
- Issue#72sacha-l2026-04-30 00:47revamp-P2-06: end-to-end alpha rehearsal #2 — the loop closes
- Issue#71sacha-l2026-04-30 00:46revamp-P2-05: Notifications card + focus-refetch on application surfaces
- Issue#70sacha-l2026-04-30 00:46revamp-P2-04: trigger points — wire notify() into admin controllers
- Issue#70sacha-l2026-04-30 00:46revamp-P2-04: trigger points — wire notify() into admin controllers
- Issue#70sacha-l2026-04-30 00:46revamp-P2-04: trigger points — wire notify() into admin controllers
- Pull request#66sacha-l2026-04-30 00:29
- Issue comment#65vercel[bot]2026-04-24 13:26chore: sync develop → main (Phase 1.5 tooling + drop legacy .eslintrc.cjs)
- Issue comment#62vercel[bot]2026-04-24 12:11feat(tester): SIWS test-wallet harness (//Alice) + runner fix
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.