Skip to content

SyncfusionExamples/Blazor-Gantt-Chart-with-Entity-framework

View on GitHub ↗Related repositories →

In the Gantt Chart, we can fetch data from the SQL database using the Entity Framework Data Model and the update the changes in CRUD action to the server by using DataManager support. To communicate with the remote data, we are using CustomAdaptor of DataManager property to call the server method.

active 2023-09-14 → 2025-09-12 (UTC)

Complete coverage28,234 / 28,234 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-03 (UTC)
Events
13
Pushes
5
Pull requests
4
Issues
0
Stars
0
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 730 days from 2023-09-14 to 2025-09-12. Pushes: 5 total, peak 2 in a day. Pull requests: 4 total, peak 2 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
rajendranr-54836220
Sarubala202200
Backiaraj2020
Edberg-Vasan1100

Recent activity

Latest issues, pull requests and releases

  • Pull request#3rajendranr-54832024-02-16 07:30
  • Pull request#3Backiaraj2024-02-16 07:21
  • Pull request#2rajendranr-54832024-02-15 06:23
  • Pull request#2Backiaraj2024-01-31 08:56

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.