📊 GraphRAG-based Document Agent — VectorRAG 기반 doc-summary-agent를 SEOCHO Layer A/B/C 구조로 재구성한 멘토링 프로젝트
active 2026-05-25 → 2026-06-02 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 9 days from 2026-05-25 to 2026-06-02. Pushes: 23 total, peak 10 in a day. Pull requests: 4 total, peak 2 in a day. Issues: 1 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| TaskerJang | 28 | 23 | 4 | 0 |
Recent activity
Latest issues, pull requests and releases
- Pull request#76TaskerJang2026-05-31 01:49
- Pull request#72TaskerJang2026-05-30 23:51
- Pull request#68TaskerJang2026-05-30 10:25
- Pull request#63TaskerJang2026-05-29 23:47
- Issue#56TaskerJang2026-05-26 14:40[Feat] P1 — Entity 추출 프롬프트 재설계 (Metric 라벨 + Few-shot + 후처리 검증)
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.