Skip to content

TenTides/SLP-02-Small-Project

View on GitHub ↗Related repositories →

The following is the base for the small LAMP stack project for Group SLP-02 for COP4331C

active 2023-09-04 → 2023-10-08 (UTC)

Complete coverage27,845 / 27,845 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-18 (UTC)
Events
54
Pushes
38
Pull requests
2
Issues
2
Stars
2
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 35 days from 2023-09-04 to 2023-10-08. Pushes: 38 total, peak 12 in a day. Pull requests: 2 total, peak 2 in a day. Issues: 2 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 2 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
TenTides171700
jconn0141400
Mxchete8420
gco1on3300

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.