Skip to content

The-OpenROAD-Project-staging/OpenROAD

View on GitHub ↗Related repositories →

OpenROAD's unified application implementing an RTL-to-GDS Flow

active 2023-08-16 → 2026-10-06 (UTC)

Complete coverage27,574 / 27,574 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-06 (UTC)
Events
6.8K
Pushes
4.1K
Pull requests
12
Issues
0
Stars
2
Forks
4

Activity over time

Daily event counts in the loaded window

Line chart, 1148 days from 2023-08-16 to 2026-10-06. Pushes: 4,106 total, peak 19 in a day. Pull requests: 12 total, peak 4 in a day. Issues: 0 total, peak 0 in a day. Comments: 19 total, peak 8 in a day. Stars: 2 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
tspyrou2.7K2.7K30
openroad-ci78978810
openroad-robot51451400
maliberty423405
hzeller220811
minjukim555500
vvbandeira2002
oharboe1001
sombraSoft1100
AcKoucher1100
jhkim-pii1100
osamahammad211100

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.