Skip to content

UMC-Utrecht-RWE/INSIGHT-Level1

View on GitHub ↗Related repositories →

Level 1 reviews the completeness and compliance with the ConcePTION CDM specifications, ensuring format, structural and relational coherence. In addition, the plausibility of the data and the uniqueness of records is addressed, maintaining data integrity as well as identifying duplication errors.

active 2023-09-062024-11-13 (UTC)

Complete coverage26,738 / 26,738 hourly files (100%) · 2 absent upstream2023-08-152026-09-02 (UTC)
Events
19
Pushes
8
Pull requests
0
Issues
4
Stars
2
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 435 days from 2023-09-06 to 2024-11-13. Pushes: 8 total, peak 2 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 4 total, peak 2 in a day. Comments: 0 total, peak 0 in a day. Stars: 2 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
ConstanzaUtrecht6600
LindaNab2000
anallg2000
vjolahoxhaj2200

Recent activity

Latest issues, pull requests and releases

  • Issue#4anallg2024-06-18 09:14
    Step 1-3 - Out of memory
  • Issue#3anallg2024-06-07 07:59
    Error Step4to5-EVENTS
  • Issue#2LindaNab2024-03-20 08:32
    Remove any occurrences of rm(ls()) in repository
  • Issue#1LindaNab2024-03-20 08:24
    Remove any occurrences of setwd() and paste() in scripts
  • ReleaseConstanzaUtrecht2023-10-23 18:59
    V1

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.