Skip to content

Ureca-Final-Project-Team2/fe_badata

View on GitHub ↗Related repositories →

[LG U+ 유레카 2기] 융합프로젝트 2조의 FE 레포지터리입니다

active 2025-06-30 → 2025-10-06 (UTC)

Complete coverage28,516 / 28,516 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-15 (UTC)
Events
2.5K
Pushes
634
Pull requests
186
Issues
182
Stars
1
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 99 days from 2025-06-30 to 2025-10-06. Pushes: 634 total, peak 36 in a day. Pull requests: 186 total, peak 18 in a day. Issues: 182 total, peak 13 in a day. Comments: 953 total, peak 104 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
coderabbitai[bot]70900536
arty09283831935949
jihoi06153601754945
eunchrri2851534221
sihyuuun2481133635
github-actions[bot]21100211
vercel[bot]560056

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.