Skip to content

Level With Me - A flexible graph-based visualization system with intelligent routing and composition-based architecture

active 2025-07-15 → 2025-08-01 (UTC)

Archive files: complete28,860 / 28,860 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-29 (UTC)Some event types are under-captured. Data limits →
Events
127
Pushes
44
Pull requests
13
Issues
16
Recorded stars
0
Recorded forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 18 days from 2025-07-15 to 2025-08-01. Pushes: 44 total, peak 13 in a day. Pull requests: 13 total, peak 4 in a day. Issues: 16 total, peak 5 in a day. Comments: 33 total, peak 10 in a day. Recorded stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

AI reviewers

AI reviewers wrote 37.0% of the captured review conversation here (led by Copilot).

17 of 46 reviews and comments, since Aug 2023 (whole loaded window) · 14 known AI reviewer accounts, a lower bound

ContributorContributionsPushesPRsComments
Copilot5834716
marcnoon5710615
MicycleBichael4002

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.