Skip to content

WooshC/ProyectoCalidad

View on GitHub ↗Related repositories →

Proyecto web de prueba

active 2024-10-19 → 2025-01-21 (UTC)

Previously known as WooshC/GR06_1BT2_622_24A (until Oct 2024). Linked by GitHub's repository id. Older names can be missing when an old name was later reused (e.g. forked back). Charts on this page cover this name only.

Archive files: complete28,842 / 28,842 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-28 (UTC)Some event types are under-captured. Data limits →
Events
135
Pushes
66
Pull requests
36
Issues
0
Recorded stars
0
Recorded forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 95 days from 2024-10-19 to 2025-01-21. Pushes: 66 total, peak 12 in a day. Pull requests: 36 total, peak 12 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Recorded stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
JoelDefaz5526290
WooshC342770
BrayanM318800
Demonkinng5500

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.