Skip to content

active 2025-02-172025-03-22 (UTC)

Complete coverage26,740 / 26,740 hourly files (100%) · 2 absent upstream2023-08-152026-09-02 (UTC)
Events
26
Pushes
10
Pull requests
0
Issues
15
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 34 days from 2025-02-17 to 2025-03-22. Pushes: 10 total, peak 5 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 15 total, peak 15 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
ZabWP251000

Recent activity

Latest issues, pull requests and releases

  • Issue#12ZabWP2025-02-24 21:24
    database tables and type of database management systems
  • Issue#12ZabWP2025-02-24 21:24
    database tables and type of database management systems
  • Issue#11ZabWP2025-02-24 21:23
    draw 4 use cases diagrams
  • Issue#10ZabWP2025-02-24 21:23
    list all requirements for project (15 requirements)
  • Issue#9ZabWP2025-02-24 21:23
    list all use cases for project (15 cases) in the correct format
  • Issue#7ZabWP2025-02-24 21:22
    revise problem statement (highlight changes from sprint 1)
  • Issue#8ZabWP2025-02-24 16:26
    create github link and attach screenshot to report
  • Issue#8ZabWP2025-02-24 16:26
    create github link and attach screenshot to report
  • Issue#8ZabWP2025-02-24 16:26
    create github link and attach screenshot to report
  • Issue#8ZabWP2025-02-24 16:26
    create github link and attach screenshot to report
  • Issue#6ZabWP2025-02-24 16:25
    revise problem statement (highlight changes from sprint 1)
  • Issue#5ZabWP2025-02-24 16:25
    revise problem statement (highlight changes from sprint 1)
  • Issue#4ZabWP2025-02-24 16:25
    revise problem statement (highlight changes from sprint 1)
  • Issue#3ZabWP2025-02-24 16:25
    revise problem statement (highlight changes from sprint 1)
  • Issue#2ZabWP2025-02-24 16:24
    Fill out planning and scheduling

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.