active 2025-02-17 → 2025-03-22 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 34 days from 2025-02-17 to 2025-03-22. Pushes: 10 total, peak 5 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 15 total, peak 15 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| ZabWP | 25 | 10 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#12ZabWP2025-02-24 21:24database tables and type of database management systems
- Issue#12ZabWP2025-02-24 21:24database tables and type of database management systems
- Issue#11ZabWP2025-02-24 21:23draw 4 use cases diagrams
- Issue#10ZabWP2025-02-24 21:23list all requirements for project (15 requirements)
- Issue#9ZabWP2025-02-24 21:23list all use cases for project (15 cases) in the correct format
- Issue#7ZabWP2025-02-24 21:22revise problem statement (highlight changes from sprint 1)
- Issue#8ZabWP2025-02-24 16:26create github link and attach screenshot to report
- Issue#8ZabWP2025-02-24 16:26create github link and attach screenshot to report
- Issue#8ZabWP2025-02-24 16:26create github link and attach screenshot to report
- Issue#8ZabWP2025-02-24 16:26create github link and attach screenshot to report
- Issue#6ZabWP2025-02-24 16:25revise problem statement (highlight changes from sprint 1)
- Issue#5ZabWP2025-02-24 16:25revise problem statement (highlight changes from sprint 1)
- Issue#4ZabWP2025-02-24 16:25revise problem statement (highlight changes from sprint 1)
- Issue#3ZabWP2025-02-24 16:25revise problem statement (highlight changes from sprint 1)
- Issue#2ZabWP2025-02-24 16:24Fill out planning and scheduling
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.