Skip to content

Módulo de Interface do Controle da embarcação solar Guarapuvu II (Zênite Solar)

active 2025-02-222025-11-11 (UTC)

Complete coverage26,603 / 26,603 hourly files (100%) · 2 absent upstream2023-08-152026-08-27 (UTC)
Events
21
Pushes
13
Pull requests
2
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 263 days from 2025-02-22 to 2025-11-11. Pushes: 13 total, peak 2 in a day. Pull requests: 2 total, peak 2 in a day. Issues: 0 total, peak 0 in a day. Comments: 1 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
ayresgit5500
Gustavo-V-F4400
joaoantoniocardoso3110
AlejoPm032110
sourcery-ai[bot]2001
victorlompa1100
IvanAndreolla1100

Recent activity

Latest issues, pull requests and releases

  • Pull request#2joaoantoniocardoso2025-02-22 22:49
  • Issue comment#2sourcery-ai[bot]2025-02-22 18:57
    New ids
  • Pull request#2AlejoPm032025-02-22 18:57

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.