Skip to content

智慧园区管理系统:基于园区业务,深度挖掘流程与系统的关键结合点,发挥互联网的优势,系统主要实现园区的资产管理,企业服务及档案管理,园区的活动及商城的搭建。

active 2023-08-22 → 2026-04-23 (UTC)

Complete coverage27,998 / 27,998 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-24 (UTC)
Events
18
Pushes
0
Pull requests
0
Issues
0
Stars
16
Forks
2

Activity over time

Daily event counts in the loaded window

Line chart, 976 days from 2023-08-22 to 2026-04-23. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 16 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

Nobody pushed, opened or commented here in the loaded window — this repo's activity is stars and forks only.

Recent activity

Latest issues, pull requests and releases

No issue or PR events — this repo's activity is pushes only.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 16 stars here means stars gained during the window, not the repo's star count.