Skip to content

REST API for Fleet Management Software to track the locations of a taxi company's vehicles.

active 2024-08-312025-04-03 (UTC)

Complete coverage26,408 / 26,408 hourly files (100%) · 2 absent upstream2023-08-152026-08-19 (UTC)
Events
227
Pushes
50
Pull requests
37
Issues
79
Stars
1
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 216 days from 2024-08-31 to 2025-04-03. Pushes: 50 total, peak 6 in a day. Pull requests: 37 total, peak 6 in a day. Issues: 79 total, peak 19 in a day. Comments: 14 total, peak 4 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
abengl180503714

Recent activity

Latest issues, pull requests and releases

  • Pull request#71abengl2024-10-17 20:18
  • Pull request#71abengl2024-10-17 20:18
  • Pull request#70abengl2024-10-17 17:59
  • Pull request#70abengl2024-10-17 17:59
  • Issue#65abengl2024-10-17 17:52
    US 11 - Export to Excel Endpoint
  • Issue#67abengl2024-10-17 17:52
    US11 - DoD - Export completition criteria
  • Issue#57abengl2024-10-17 16:33
    US9 - AC1 - Data loading
  • Issue#60abengl2024-10-12 21:22
    US 10 - Optimized Response Times
  • Issue#62abengl2024-10-12 21:21
    US10 - DoD - Optimization completition criteria
  • Issue#61abengl2024-10-12 21:20
    US10 - AC1 - Implement strategy for enhanced performance
  • Issue comment#69abengl2024-10-12 21:19
    feat: excel file report sent to email
  • Pull request#69abengl2024-10-12 21:06
  • Pull request#69abengl2024-10-12 21:06
  • Issue#66abengl2024-10-11 21:44
    US11 - AC1 - Implement export endpoint
  • Pull request#68abengl2024-10-11 21:43
  • Pull request#68abengl2024-10-11 21:43
  • Issue#67abengl2024-10-11 02:07
    US11 - DoD - Export completition criteria
  • Issue#66abengl2024-10-11 02:07
    US11 - AC1 - Implement export endpoint
  • Issue#65abengl2024-10-11 02:06
    US 11 - Export to Excel Endpoint
  • Pull request#63abengl2024-10-10 22:38
  • Pull request#63abengl2024-10-10 22:38
  • Issue#62abengl2024-10-10 19:44
    US10 - DoD - Optimization completition criteria
  • Issue#60abengl2024-09-25 00:27
    US 10 - Optimized Response Times
  • Issue#59abengl2024-09-25 00:17
    US9 - DoD - Data enhancement completition criteria
  • Issue#58abengl2024-09-25 00:17
    US9 - AC2 - Data loading

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.