Skip to content

A tool for testing a company's software packages together in the context of a realistic, functioning, best practices Drupal build

active 2023-08-21 → 2026-09-28 (UTC)

Archive files: complete28,617 / 28,617 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-19 (UTC)Some event types are under-captured. Data limits →
Events
2K
Pushes
681
Pull requests
469
Issues
27
Recorded stars
5
Recorded forks
2

Activity over time

Daily event counts in the loaded window

Line chart, 1135 days from 2023-08-21 to 2026-09-28. Pushes: 681 total, peak 31 in a day. Pull requests: 469 total, peak 13 in a day. Issues: 27 total, peak 8 in a day. Comments: 209 total, peak 13 in a day. Recorded stars: 5 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 5 stars here means stars gained during the window, not the repo's star count.