Skip to content

Proof Of Concept qui doit répondre à : l'envoi et la reconstitution d'un message de type son, la gestion de la réception d'un signal avec bruit, l'utilisation d'une liaison half duplex (accusé de réception), un code de correction d'erreur, la mise en œuvre d'un second type de modulation/démodulation et la simulation entre 2 PC

active 2024-03-21 → 2024-03-21 (UTC)

Complete coverage28,283 / 28,283 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-05 (UTC)
Events
3
Pushes
1
Pull requests
0
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 1 days from 2024-03-21 to 2024-03-21. Pushes: 1 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
adam31-71100

Recent activity

Latest issues, pull requests and releases

No issue or PR events — this repo's activity is pushes only.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.