Skip to content

Creating alignment plots from bam files

active 2024-01-29 → 2026-11-03 (UTC)

Complete coverage28,461 / 28,461 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-12 (UTC)
Events
1.1K
Pushes
292
Pull requests
325
Issues
16
Stars
37
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 1010 days from 2024-01-29 to 2026-11-03. Pushes: 292 total, peak 10 in a day. Pull requests: 325 total, peak 8 in a day. Issues: 16 total, peak 3 in a day. Comments: 69 total, peak 4 in a day. Stars: 37 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
fxwiegand38119313718
dependabot[bot]2346715512
github-actions[bot]77263219
codecov-commenter150015
BenOrl7610
sharkLoc4002
ZhongshiHe2000
rohan-ibn-tariq2000
NathaneilKnight1000
zhangyanchen02211001
var-chenm46801001
twrightsman1000
famosab1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 37 stars here means stars gained during the window, not the repo's star count.